A resubmission of the Site Plan Control application for 398-406 Roosevelt have been received by the City of Ottawa. Previously, as some may remember, the Zoning By-law Amendment application had been approved by Council in June 2018, but it was subsequently appealed to the Local Planning Appeal Tribunal (now the Ontario Land Tribunal). In April 2021, LPAT dismissed the appeal, which allowed the Zoning By-law Amendment to come into force. The owners of the original project (Domicile) have now sold the project to ML Devco. Consequently, this is their resubmission of the project's Site Plan Control application.

The primary revisions to the project include the following:

  • The building is now proposed as residential, with previous the previous ground-floor commercial component removed.
  • Surface parking has been removed and the site will only have underground parking; the rear yard surface parking and driveway has been replaced with private landscaped terraces for the ground-floor units.
  • The rooftop terrace on the south side of the 5th floor has been removed; units have now been proposed with private amenity spaces in the form of balconies and terraces.
  • The proposed architecture has been changed; the previous red-brick design has changed to stone and earth-tone panelling.

The resubmission is live on Devapps, where you can review additional supporting documents for this application.

You can register for future notifications about this application by submitting a form in the “Send Feedback” button in the DevApps package or by e-mailing the planner (Andrew McCreight, andrew.mccreight@ottawa.ca) and requesting to receive future notifications on this file (#D07-12-17-0171)

As always, please send your feedback on this file to the lead planner on the file, Andrew McCreight (andrew.mccreight@ottawa.ca). Please also consider sending us feedback on the proposed development and including us on any correspondence with the planner via Jeff.Leiper@ottawa.ca  and/or Stephany.Chevalier-Crockett@ottawa.ca.

Posted January 27, 2022